How it works

We provide products for every stage of construction - Plan, Build, and Finish.

Step-by-Step Guide

What’s included?

PANL Plans

  • Plans and elevations, including your selected finish plans and 3-4 foundation options

  • MEP and Structural Engineer Reviewed Drawings. Engineering Stamps are available for an added fee, paid directly to our engineering partners.

  • Finish Material Packages prepped for quick ordering with our partners (excluding U-Spec option)

  • Material order quantities for all building materials

  • License to build one home unit based on the provided plans. Multi-unit licenses are available upon request.

PANL Framing Kits

  • Pre-fabricated, insulated, sheathed wall and roof panels with all window and door rough openings pre-cut

  • Splines for panel connections

  • Lumber pieces required for panel assembly

  • Specialized panel screws

  • Panel-specific adhesive

  • Panel-specific seam tape

  • Easy-to-follow assembly instructions

  • Manufactured in the U.S., shipping anywhere in the continental U.S.

PANL Spec Books

  • Finish material packages with our partners

  • Direct links to pre-built shopping carts or pre-formatted order emails, depending on the partner/package

  • Links to product information and specifics

  • Dedicated customer support from our best-in-class partners

  • Ability to customize your packages and time your order arrivals based on your build schedule

  • Detailed materials spreadsheet that you can share with your builder to keep track of materials, pricing, and more.

How much does it cost?

The total cost will be heavily dependent on your project specifics, including but not limited to build location, utilities, foundation selection, builder labor rates, which finish spec you opt for, and any customizations you make. For a rough ballpark, check out our Cost Estimator tool.

How long does it take?

Purchase Plans, acquire land, find a builder, determine your financing, and submit plans for permitting

Plan

1-3 Months

Order your Framing Kit, prep your land, install utilities, and build your foundation

Build

1-2 Months

Assemble your Framing Kit, order Spec Book materials, and finish your space

Finish

2-4 Months

After inspections are complete, your space will be ready for furniture and move-in.

Total

4-9 Months*

*Timelines are estimates only and assume no unexpected delays with material ordering, labor, site-specific issues, or other unforeseen circumstances. If planning to DIY, we recommend that you allow more time for construction.

What makes PANL different?

PANL
Online Plans
Home Builders
Prefab Homes
All plans reviewed by engineers
✔️
X
$$$
Depends
Designed with cutting-edge materials and efficiency in mind
✔️
X
$$$
X
Builder-friendly, commercial-grade construction drawings
✔️
X
$$$
X
Modern designs
✔️
Depends
$$$
Depends
Easy-order finish material packages with full customization potential
✔️
X
X
X
DIY-friendly
✔️
X
X
X
Typical Order-to-Move-in timeline
6-8 months or less
9-12 months
9-12 months
6-9 months