How it works
We provide products for every stage of construction - Plan, Build, and Finish.
Step-by-Step Guide
What’s included?
PANL Plans
Plans and elevations, including your selected finish plans and 3-4 foundation options
MEP and Structural Engineer Reviewed Drawings. Engineering Stamps are available for an added fee, paid directly to our engineering partners.
Finish Material Packages prepped for quick ordering with our partners (excluding U-Spec option)
Material order quantities for all building materials
License to build one home unit based on the provided plans. Multi-unit licenses are available upon request.
PANL Framing Kits
Pre-fabricated, insulated, sheathed wall and roof panels with all window and door rough openings pre-cut
Splines for panel connections
Lumber pieces required for panel assembly
Specialized panel screws
Panel-specific adhesive
Panel-specific seam tape
Easy-to-follow assembly instructions
Manufactured in the U.S., shipping anywhere in the continental U.S.
PANL Spec Books
Finish material packages with our partners
Direct links to pre-built shopping carts or pre-formatted order emails, depending on the partner/package
Links to product information and specifics
Dedicated customer support from our best-in-class partners
Ability to customize your packages and time your order arrivals based on your build schedule
Detailed materials spreadsheet that you can share with your builder to keep track of materials, pricing, and more.
How much does it cost?
The total cost will be heavily dependent on your project specifics, including but not limited to build location, utilities, foundation selection, builder labor rates, which finish spec you opt for, and any customizations you make. For a rough ballpark, check out our Cost Estimator tool.
How long does it take?
Purchase Plans, acquire land, find a builder, determine your financing, and submit plans for permitting
Plan
1-3 Months
Order your Framing Kit, prep your land, install utilities, and build your foundation
Build
1-2 Months
Assemble your Framing Kit, order Spec Book materials, and finish your space
Finish
2-4 Months
After inspections are complete, your space will be ready for furniture and move-in.
Total
4-9 Months*
*Timelines are estimates only and assume no unexpected delays with material ordering, labor, site-specific issues, or other unforeseen circumstances. If planning to DIY, we recommend that you allow more time for construction.
What makes PANL different?
Still have questions?